How we stay unbiased
The recommendation is a calculation, not a lead.
unbiased.energy does not sell a system. An introduction happens only if you ask, after you review what would be shared. The size comes from your usage, a published rate, a public price range, and the preference you pick. A contractor’s quote will differ. This page is the record of how the number was made.
What goes in
Four ways to describe usage: a utility connection when one is available, an interval file, a bill, or figures you type. A bill with readable text is parsed here. A photo without text asks you to type the kilowatt-hours.
Planned equipment is added on top of today’s use. One electric vehicle is 3,000 kWh a year, about 12,000 miles at 4 miles per kWh, charged from 6 pm to midnight. A heat pump is a planning allowance of 2,500 kWh for a home and 8,000 kWh for a building, concentrated from November through March. It is not a heating design.
Rates
California addresses use bundled tariff cards for PG&E, SCE, and SDG&E, chosen from the ZIP as a territory hint. PG&E solar is billed on the schedule the card requires after interconnection (E-ELEC for E-TOU-C). Export credits for PG&E use the 2026 net-billing price sheet bundled with the site. Other California utilities fall back to a zero export credit when that sheet is not bundled, and the result says so.
Everywhere else, a national utility-rate record is used when that service is available. The record is simplified to an average energy rate, plus an average demand charge for a business when the record has one. Otherwise, imports use the EIA statewide average for September 2025 (Electric Power Monthly Table 5.6.A). That is one month for the whole state. Same-hour solar offsets imports. Surplus exports are valued at $0 until a real export tariff is loaded.
Production and the battery
When a weather service is available, annual production can come from NREL PVWatts. Otherwise California uses a bundled ZIP3 yield table. The shape is a clear-day geometric model, south-facing, tilt equal to latitude, scaled to that annual figure. It has no cloudy days, so winter output is a little high. The battery stores surplus solar and serves later load, holding 10% in reserve, with about a 10% round-trip loss. It does not forecast the hour of a demand peak. Backup hours are 90% of nameplate divided by the critical load (1.5 kW for a home unless you set another figure).
The preference
Best NPV, best IRR, fastest payback, and largest year-1 savings each rank the same grid of sizes. Resilience keeps only the designs that meet the backup-hour target, then picks the best NPV among them. Usable roof, carport, and ground area cap the array at 16 watts per square foot of the area you enter. The search is not pulled toward a company “typical” system size.
Money
Later bills grow 4% a year in nominal dollars. That is a planning assumption, lower than the 7% escalator many sales proposals use. A higher escalator makes solar look more valuable. Production declines 0.5% a year. NPV uses a 6% discount rate over 25 years. Operating costs are not deducted; NREL publishes an operations benchmark, and it is described on the cost guide rather than subtracted here.
A homeowner cash purchase does not include the residential clean energy credit. IRC 25D ended for property placed in service after December 31, 2025. A business uses the 30% IRC 48E credit when the in-service date still qualifies: construction after July 4, 2026 has to reach service by December 31, 2027. The energy-community, domestic-content, and low-income adders are described and not applied. Equipment and the IRS site lists are not known from a ZIP. California businesses are illustrated with a 21% federal and 8.84% state income-tax rate, including depreciation. Other states are illustrated without a state income tax. This is not tax advice.
Price
The installed-price band is the public range on the cost guide. Cash flows use the midpoint. NPV, IRR, and payback are shown from the high price to the low price. Nothing in the band comes from a private contract file.
What we keep
An estimate can be run without a name. Uploaded files that you do not attach to a consented contact are deleted after 24 hours. A consented contact is kept for 24 months. The log stores a hash of the network address when a salt is configured, and it does not store the raw address or a street.